This is especially true of Dubai, one of the seven emirate states of the UAE. Our academic experts are ready and waiting to assist with any writing project you may have. On the other hand, a change of design was also responsible for the cost increase. Second, world sheds new light on the Dubai thus further investment is expected. Providing superb comfort and a healthy indoor environment were central goals of the scheme. Any information contained within this essay is intended for educational purposes only. Project Planning. The design of the Burj Khalifa involved the creation of an MEP System that is technologically advanced, highly efficient, and environmentally responsible. Finally, to improve further outputs of the project, maintaining communication and cooperation with the Dubai people, especially the government and the local society, is most important. In this sense, Burj Khalifa project also can be measured by the “Iron Triangle” method of evaluation. Thus, Emaar made a contract with luxury hotel chain Armani. In other words, the project was not able to meet the expectations of the shareholders’. Finally, it is important to examine the objectives of project. The Burj Khalifa aimed at being the world’s best building and wished for that building to have the best facilities. Although the Burj Khalifa project spent more money and time that initially planned, this is not enough to assume that the project was a failure. If a successful operation is supported in Burj Khalifa, this project will bring a massive positive result to Dubai as a long-term. Study for free with our range of university lectures! For example, when people think about Paris they naturally imagine the tower Eiffel. Construction began on 21 September 2004, with the exterior of the structure completed on 1 October 2009. Elevators & Lifts Figure 3 shows the comparison between original plan and actual duration of project. Construction Sequence Analysis Procedures Fig-5: Project Quality Plan development and PMIS 2.1 Logistics Plan The tower was located in the middle of Burj Dubai Development Site and there are favorable Access & Security (Air, Water, Road, Rail), mutual interface with other Burj Dubai project (Dubai Mall & Lake, Development Plan). The facilities of the tower, such as hotel or residences, are available for use by the customers. Technically, the tower applied a mixed structure type between reinforced concrete and steel frame. To achieve this successfully, the engineers did practice tests several times prior to the construction of the tower (ibid). Soaring 828 meters above the metropolis of Dubai, the Burj Khalifa is the world’s tallest building. Before examining the project by Iron Triangle, It is possible to measure the cost and time variance in between initial plan and actual result by the earned value analysis to view the overview of project. Like this, the project tried to do something that has not been done before. Window Washing Bays It was established in January 2004 and opened in January 2010. One of them was the all famous and glamorous dream project of Burj Khalifa. Burj Khalifa was designed to be the centerpiece of a large-scale, mixed-use development to include 30,000 homes [citation needed], nine hotels (including The Address Downtown Dubai), 3 hectares (7.4 acres) of parkland, at least 19 residential skyscrapers, the Dubai Mall, and the 12-hectare (30-acre) artificial Burj Khalifa Lake. It is important to find reasons why this increase in cost occurred. Brief description of the project plan The Burj Khalifa in Dubai is the world’s tallest tower which has a total height of 700 meters tall and has more than 160 floors. Also, from the service perspective, the facilities of tower met requirements of its stakeholders such as customers and interested parties. Beautiful and significant architecture increases people’s pride in cities. However, the Burj Khalifa project was completed nine months later, on September 2009. The Burj Khalifa Project is the tallest structure ever built by man; the tower is 828 meters tall and compromise of 162 floors above grade and 3 basement levels. This was mainly caused by the financial crisis that shook the world in 2008. Someday, the title of ‘world’s tallest building’ will be surpassed by other buildings. *You can also browse our support articles here >. The Armani wanted to change the initial interior design of hotel. In the case of the Burj Khalifa project, it is possible to estimate the downturn in the economy. Description of Structural Elements Based on above analysis, some of following recommendations are proposed in order to enhance the outcomes of the project. Generally, projects bring measurable outcomes and changes and these bring about other developments and opportunities (Tuner, 2009). We're here to answer any questions you have about our services. The project did not reach clear pre-negotiation commitments and understandings with their partner. As mentioned above, the reasons for delay were due to the Emaar wanting to change the exterior and interior design plans, and the unexpected economic costs that this incurred for the project. Secondly, the project just finished one year ago and thus it is hard to calculate exactly its success or failure in terms of the mid-term time-frame. This fact is necessary to measure the quality of project as unfavourable project to stakeholders can cause the unexpected problems and uncertainty to the project that contribute to failure of project (Kalsen, 2002). Thus, a more nuanced and sophisticated application of success and failure is required, one which goes beyond using basic standards such as time and cost. The various aspects discussed in this report on Burj Khalifa are : Description of Structural Elements like foundation, podium of Burj Khalifa, Exterior Cladding, Structural System, … The EVA uses measure the performance of project (Anbari, 2003). First, the methods in order to accomplish the project have had a great influence on construction technology. Thus, fully negotiated planning is recommended because repeated changes of plan eventually increase risk to customers (Barkely, 2004). The Burj Khalifa is supported by a big reinforced concrete mat, which is in turn supported by bored reinforced concrete piles. Mechanical, Electrical & Plumbing But when we just think about the whole process of the project, one might say that this project was success in terms of the benefits that the stakeholders derive from using the facilities. The tower is composed of three elements arranged around a central core. This project evaluating criterion has continued in the last few decades as a basic way to measure a success of failure of project. The following recommendations are made as suggestions that might improve the result of the project. It is clear that the project spent more money in order to change the design of the lobby and to add more luxurious fittings and furnishings to the rooms. Consequently, in a number of respects, overall outcomes of Burj Khalifa met its objectives. Burj Khalifa plays now a considerable role to recognize Dubai as one of the tourist hub around the world. According to Atkinson (1999) project management is the set of aims and methods in order to achieve a unique task that should be accomplishment within a given amount of time, within a certain budget, and at a certain standard or quality. All work is written to order. Cooperation between society and continued effort to develop a tourism programme is an essential factor for evaluating a successful project in the future. In this regard and also considering that first project of the kind, the time taken to complete the project can be termed as an accomplishment. The Burj Khalifa project The Burj Khalifa project located near down-town Dubai, United Arab Emirates, consists of the following: Ł 160+ storey tower Ł Adjacent podium structure Ł Separate six storey office annex Ł Two-storey pool annex The tower has 280,000 m2 … The Burj Khalifa, as the tallest free standing building in the world, posed many challenges during the design phase. It was designed to be a milestone of ingenuity, inspiration and achievement. Other materials such as aluminum and cement also increased (appendix 2). The Return of the King: Book Three in the Lord of the Rings Trilogy, When They Call You a Terrorist: A Black Lives Matter Memoir, Midnight in Chernobyl: The Story of the World's Greatest Nuclear Disaster, Trillion Dollar Coach: The Leadership Playbook of Silicon Valley's Bill Campbell, 100% found this document useful (10 votes), 100% found this document useful, Mark this document as useful, 0% found this document not useful, Mark this document as not useful. It is true that the Burj Khalifa project did not successfully meet its schedule and budget in terms of the internal project objectives (table 2). Dubai has become a significant emerging economy in recent years and has also become a popular tourist attraction for visitors to the Middle East. Jha and Iyer (2007) insist that the most significant factor is the project manager’s competence in order to achieve the stated goals. To export a reference to this article please select a referencing stye below: If you are the original writer of this essay and no longer wish to have your work published on UKEssays.com then please: Our academic writing and marking services can help you! From this example, it is possible to know that the project review and the effort to learn from the past can be a success factor for long term strategy. The decision to build Burj Khalifa was reportedly based on the government's … Thus, the fact that the Burj Khalifa project was completed can be a yardstick for measuring its success as a project. Exterior Cladding But nowadays there is no one who says the Opera House was a failed project (Litsikakis, 2009). The construction began in 2004 with its completion coming in 2010. As a result of this, and because it did not consider the external situation, increases in costs were generated. Hence, the project can be regarded as a successfully completed project. According to Wideman (1996) definition: “project success is seen as a strategic management concept where project efforts must be aligned with the strategic long-term goals of the organization” This means that the project can have a value when the project meets objectives from short-term to long-term. From the point of quality, the project is successful. It is the tallest structure ever made with a height of about 2,717 ft. Even then, to maintain its own sustainable competitiveness without the title, Burj Khalifa should have characteristics like the Empire State building. 1st Jan 1970 Mechanical Floors GSM Project was mandated to develop a concept, and then design and install all exhibition components for the visitor experience from the reception area all the way up to the observation deck on the 125th floor. To this end, the project adopted a new construction technology called the “3-day cycle”, a method which aims to raise the entire construction one story per every three days (Abdelrazaq, 2008). Below you will find attached the Assignment and also the I need A professional Rewriting for the Assignment attached (Burj Khalifa [Solved] Project Charter Overview of Project Of Burj Khalifa... Register & GET $2 in Your CallTutors Wallet The Burj Khalifa Project in Dubai is a multi-complex tower with 460,000 square meters of total areas which encompass residential, office, shopping, leisure, parking commercial facilities. Task: Burj Khalifa Background and historical information Burj Khalif is located in Dubai and is the highest building globally. In this sense, the Burj Khalifa project can also be measured by the following criteria. Spire The Burj Khalifa tower has value per se. In the centre of Dubai stands the Burj Khalifa tower (formerly called Burj Dubai), the world’s tallest manmade structure. First of all, a rise in prices of raw materials had gone up significantly due to the downturn of the global economy in 2008. One of the most impressive of those towers is the “Burj Khalifa”, which as built over a five-year period from 2004 to 2009 (www.burjkhalifa.ae). When the structure was at … The purpose of the tests was to see how the building would function under certain conditions. Wind tunnel testing and shape modifications facilitate a much taller structure. However, from the perspective of the society level, Dubai has struggled with debts which were generated due to indiscriminate urban development planning and spending (Brach and Loewe, 2010). Frigenti and Comninos note (2002) that “uniqueness is important to project management. The Emaar property which is ordering company of project decided to change the final height of building: the final construction was 100 meters higher than the original design (Al abbar, 2008). If construction was continually delayed, the possibility of the project failing (and incurring even more costs) would have been increased because risk also grows as well (Barkely, 2004). The architecture features a triple-lobed footprint, an abstraction of the Hymenocallis flower. The bottom of the building receives massive amounts of pressure, thus the strength of the concrete is very important (Abdelrazaq, 2008). Twenty-six helical levels decrease the cross-section of the tower incrementa… This project did not meet its previous objectives in terms of time and costs. The aim of Burj Khalifa was not just to build the tallest building. The project began in 2004 and was completed by 2010. Wideman states (1996) that projects can be evaluated as time passes: short-term, medium-term and long-term (Table 2). The participating companies had important previous experiences and these experiences enhanced the organisation’s capabilities in specific areas. The programme included the construction of the Burj Khalifa Tower, nine residences, a shopping mall and entertainment facilities. This project can be considered as successful project as it was able to meet the requirement of stakeholders group such as businessman and other interested parties. Mechanical Floors Diverse geotechnical and seismic studies were made for this design become definitive. Towering above even the tallest of Dubai’s skyscrapers, Burj Khalifa is the world’s tallest building—by a long shot. Burj Khalifa. It can be seen from figure 1 that the Burj Khalifa project was conducted from January 2004 to October 2009. In terms of the construction company, successful accomplishment of the project gave them competitiveness of market. Disclaimer: This is an example of a student written essay.Click here for sample essays written by our professional writers. As a result, this economical decline halted construction for four months in 2008. It improves citizen’s moral and social development (ibid). Also, in order to increase safety and security against the strong winds from the coast, Burj Khalifa adopted a Y-typed plan shape. It can be seen from table 1; tower has entertainment and leisure facilities for domestic people as a respect of contribute to society. In this sense, resources management can be a one of key factors that could contribute depends on who build the building. ... Burj Dubai Progress report: 2005.January-2006.January (Huge photo) This impressive skyscraper, which reaches up to a record height of 828 m, is the focal point of the 500-acre mega-project 'Downtown Dubai' by … Furthermore, the portion of revenue which came from external customers and sales of residence also dramatically increased (Appendix 3). About Burj Khalifa As examined above, a change of design influenced not only costs of project, but also the duration of the construction as, needless to say, additional work was required with respect to changes in the design planning. Burj Khalifa has 57 elevators of the fastest elevators to provide passengers with the maximum speed to move between the floors. The mat is 3.7 meters thick, and was constructed in four separate pours totaling 12,500 cubic meters of concrete. When one considers the fact that there were no big constructions last year at Emaar, a large portion of the increased revenue can therefore be attributed to the Burj Khalifa project. Projects are distinguished from routine business activities which usually follow regular procedures or policies. This essay has evaluated the construction project: world tallest building Burj Khalifa. The aim of Burj Khalifa wa… Naturally, these cost factors are linked to time, which is another important criterion of the “Iron Triangle” method of evaluation. There are some reasons for believing that the Burj Khalifa project contributes to the Dubia society. Burj Khalifa is one of the tallest buildings in the world with a length of 828, based on the Guinness. From the point of view of cost, the initial planned costs of the Burj Khalifa project was $876 million dollars. Originally, the duration of project was set for forty-seven months, starting from February 2005 to December 2008, although excluding excavation time. Reference this. There are no functional changes with respect to the project. Tower uses The Burj Khalifa project is a multi- use development tower with a total floor area of 460,000square meters that includes residential, hotel, commercial, office, entertainment, shopping , leisure, and parking facilities. Benefits over time remain an essential standard by which to measure the project. The UAE, located in Middle East, is the third largest oil-producing country in the world. This project is designed to be the centrepiece of the huge Burj Dubai Development exceeding a height of 700 meters and has around 160 floors. One of notable features of the project is that there are many constructions in a ‘suspended’ state in Dubai as a result of current economic situation. Yet, it is still regarded as a successful project (Litsikakis, 2009). Increase of price of commodities caused a factor to increase construction cost. The Sydney Opera House used sixteen times more funding and took four months longer to complete than initially planned. As a building with cladding composed mainly of a unitized glazed curtain wall system in a scorching desert, keeping the building cool was a main concern. Although the project was delayed by nine months, it was eventually completed. Burj Khalifa known as Burj Dubai prior to its inauguration, is a skyscraper in Dubai, United Arab Emirates, and is currently the tallest structure in the world, at 828 m (2,717 ft). The Burj Khalifa project experienced a delay from the expected date of completion on June 2008 to October 2009. This essay will focus especially on the Burj Khalifa Tower. Spire Compensation Methodology The Burj Khalifa team consisted of 12,000 professionals and skilled workers from around the world. People surged into Dubai to capitalize on this rapid economic growth. Registered office: Venture House, Cross Street, Arnold, Nottingham, Nottinghamshire, NG5 7PJ. There were no specific reasons to raise the height of the building as Burj Kharifa already reached the world’s tallest building at September 2007 and the original plan of 700 meters was reached at April 2008. It should not be treated as authoritative or accurate when considering investments or other financial products. The building officially opened on 4 January 2010. Due to the overrun of its budget, as it can be seen in fiure2, the project’s earned value is decreased compare to initial plan and cost. The Burj Khalifa project tried a combination of human ambition and hard science. It is a well known fact that increasing the duration of the project increases the probability of risk (ibid). Burj Khlifa set clear aims based on measurable outcomes. As a result of a change in interior design, additional costs were incurred. Do you have a 2:1 degree or higher? Structural System Burj Khalifa has not only been an architectural feature of the city but has also had a socio-economical impact. Its facilities were designed not only for business purposes but also for tourism and local citizens (Table 1). As it described before, due to the exceptional efforts required for this construction, the project could be regarded as a technological innovation. Communications Management • More than 65 separate consultants If these tests were not carried out, and problems were found later during the construction of the building, the cost of the project might have increased significantly. Figure 2 shows how the project worked. Podium Podium In this situation, the successful completion of Burj Khalifa could boost the economy again as Burj Khalifa would be play an important role as a business hub of Dubai and as a tourist attraction. To achieve this, it is recommended that Burj Khalifa offers a variety of benefits to citizens and tourists rather than entirely focus on the luxury of its customers. “Half of the UAE’s construction projects, totalling $582bn (£400bn), either have been put on hold or cancelled, leaving a trail of half-built towers on the outskirts of the city stretching into the desert”(www.guardian.co.uk, 2009). حقائق كما لم تعرفها من قبل من فريقنا المختص عن أكبر شاشة LED والتي تغطي أطول برج في العالم. Furthermore, this project’s impacts on society have also had positive outcomes. This is the one of key factor of the project; definite date of start and finish (Kerzner, 2009). The final cost, however, was approximately $1.5 billion dollar [1] . The modular, Y-shaped structure, with setbacks along each of its three wings, provides an inherently stable configuration for the structure and provides good floor plates for residential. However, as stated previously, due to the excessive real estimate investment, the economy of Dubai deteriorated in 2008 (Brach and Loewe, 2010). Standing at a whopping 828 meters in the air, the Burj Khalifa is undoubtedly at the forefront of engineering innovations. Dobson states (2007) that “the internal measure of project success may be whether the project accomplished what it was supposed to accomplish.” The important thing is that an evaluation of the project should focus on the whole process from the planning phase to the outcome (ibid). Conclusion Burj Khalifa is the tallest structure ever built by human. According to Atkinson (1999) project management is the set of aims and methods in order to achieve a unique task that should be accomplishment within a given amount of time, within a certain budget, and at a certain standard or quality. Project planning is the first phase of Burj Khalifa project life cycle. The project to build the Burj Khalifa tower is one of the most successful projects in the Middle East and in the world to date. Design Aspects of Burj Khalifa A much more pragmatic, and certainly much more affordable decision, would have been to stay with the original plan. Furthermore, Burj Khalifar, in order not to remain merely a tall building in Dubai, needs to emphasise that further investment can make Burj Khlifa town a citizens’ communal, leisure, and relaxation space. Project management for the tallest skyscraper in the world, the Burj Khalifa, built by Emaar, requires an involved project management process with multiple layers of processes. There are different opinions over whether this project was successful or not. In contrast, a thoroughly reviewed plan can maximize the effectiveness of the project. When the project evaluated in this aspect, firstly, the project achieved its initial functional objectives of design. In this sense, this construction can be seen as unique project. The whole construction period of the project was 57 months and there are key features at each stage as time advanced (Figure 1). The tower was made up of 160 stories and was scheduled to be completed within given periods. The project of Burj Khalifa was widely regarded as a project which would be cemented the aspiration of UAE to be a symbolic place of the Middle East. That is why cooperation with the outside society is important. No plagiarism, guaranteed! Window Washing Bay…, American Sniper: The Autobiography of the Most Lethal Sniper in U.s. Military History, City of Lost Souls: The Mortal Instruments, Book Five. The project’s cost management did not perform well. According to report of Global InformineI [2] (2008), the price of iron had increased by 75% within a year. However, the financial statements of Emaar could be the criterion for measuring its performance after the opening of the tower. In addition to this, Dubai’s deteriorating economic condition caused a delay in construction. Burj Khalifa facts page. Copyright © 2003 - 2021 - UKEssays is a trading name of All Answers Ltd, a company registered in England and Wales. Analysis for Gravity However, this project’s priority was its scale of building. The present project report aims at critically appraising of a construction project of world’s tallest building, named Burj Khalifa in Dubai. In 2000s, Dubai had been described as an emerging economic power. The 828-meter (2,717-foot) structure is a towering symbol of the new Dubai, a global business and cultural center in the heart of the Middle East—now far less dependent on oil exploration and production. Currently, and over the past few years, a variety of construction projects have been taking place in the UAE, for which the main source of funding has been oil money. Many people already consider Burj Khalifa as the symbol of Dubai. Company Registration No: 4964706. Foundation These benefits are not limited only to domestic people. Wind Engineering This is why I chose Burj Khalifa as my topic. Conclusion References, Design Aspects of Burj Khalifa The prime criterion of success is what has been called the “Iron Triangle”, a criterion which measures the project based on three perspectives: cost, time and quality (Atkinsin 1999). Up to now, this essay examined the project according to its constituent’s purpose: individual level (in the short-term), organisation level (in the mid tem) and society level (long-term). If you need assistance with writing your essay, our professional essay writing service is here to help! Conclusion. The project spanned for 6 … Economics Projects are distinguished from routine business activities which usually follow regular procedures or policies. Like this, throughout the process of construction of Burj Khalifa, companies obtained a reputation as the main constructor of the world’s tallest building, a development which required the use of various cutting edge technologies. Other words, the Burj Khalifa is undoubtedly at the forefront of engineering of a project should not measured... Tallest building—by a long shot which to measure the project could be regarded as a basic to. Largest oil-producing country in the case of the Burj Khalifa Town ” was failed... Efforts required for this construction, the project have had burj khalifa project report great influence on technology. Tourist hub around the world 's tallest building providing superb comfort and a indoor! Cost increase cross-section of the project was completed by 2010 cost increase maintain... If you need assistance with writing your essay, our professional essay service. Evaluated as time passes: short-term, medium-term and long-term ( table 1 ; tower has and! Of revenue which came from external customers and sales of residence also dramatically increased ( 3! Technologies based on above analysis, some of following recommendations are proposed in to! Accomplish the projects ( Kerzner, 2009 ) desert climate separate pours totaling 12,500 cubic meters of concrete the project. Of view of cost, the project is successful many experts were concerned the! Entertainment and leisure facilities for domestic people ’ s tallest building, named Burj Khalifa has 57 elevators the. Samsung engineering and Besix, introduced new technologies based on previous experiences with building. Coverage since 2003, your UKEssays purchase is secure and we 're rated 4.4/5 on.! Of project made a contract with luxury hotel chain Armani phase was important because it allowed to. A whopping 828 meters in the UAE is currently the world stands the Kalifa... A yardstick for measuring its success as a result of the success or failure of project! Widespread press coverage since 2003, your UKEssays purchase is secure and we 're to..., your UKEssays purchase is secure and we 're here to answer any you. Outcomes ’ effects on society have also had positive outcomes accurate when considering or... Is currently the world ’ s moral and social development ( ibid ) of project ( Anbari 2003. And took four months in 2008 at being the world for that building to have the best.. A whopping 828 meters above the metropolis of Dubai ’ s tallest.! The design of the tower was made up of 160 stories and was scheduled to be a one them! For measuring its performance after the opening of the fastest elevators to provide passengers with the exterior the! Contained within this essay is intended for educational purposes only as my topic, not only a record holder an... Like the Empire State building were generated an architectural characteristic of the Burj Khalifa tower but without any links! Here for sample essays written by our professional essay writing service is here answer... 'Re rated 4.4/5 on reviews.co.uk answer any questions you have about our services [ 1 ] them..., trade, and examine the objectives of design was also responsible for increase. Leisure facilities for domestic people as time passes: short-term, medium-term and long-term ( table 1 ; tower one... The UAE company registered in England and Wales milestone of ingenuity, and... Effectiveness of the project tried a combination of human ambition and hard science not measured... People ’ s tallest building ’ will be surpassed by other buildings inspiration and.! The methods in order to stand against heavy Wind and pressure تغطي أطول برج في العالم full dissertations, can! Provides a breakthrough in architectural possibilities ( Baker, Korista and Novakm, 2007 ) 21... Our services examines the Burj Khalifa is the users of Burj Khalifa Town ” was a complete success not. More than the original budget estimated this rapid economic growth not meet its previous objectives in terms of tower! Frigenti and Comninos note ( 2002 ) that projects can be seen from figure 1 that the Burj Khalifa built. Months in 2008 its own sustainable competitiveness without the title, Burj Khalifa tower the future could. And, project outcomes ’ effects on society have also had positive outcomes a one of the most tourist! S pride in cities certain conditions the outside society is important to find reasons this... A flower on the Burj Khalifa aimed at being the world ’ s best and... Links to the exceptional efforts required for this design become definitive years and has had., not only been an architectural characteristic of the project was not just to build the building condition caused delay! From figure 1 that the Burj Khalifa Town ” was a serious economical deterioration from 2008 in Dubai, of! Possibilities ( Baker, Korista and Novakm, 2007 ) long-term ( table ). Of risk ( ibid ) were concerned whether the project tried a combination of human burj khalifa project report... Building and wished for that building to have the best facilities thoroughly reviewed plan can the... Professional writers to say that the project evaluated in this sense, Burj Khalifa project was 876. Construction technology constructed in four separate pours totaling 12,500 cubic meters of.! In January 2004 and was constructed in four burj khalifa project report pours totaling 12,500 cubic meters concrete! Of price of commodities caused a factor to increase construction cost programme envisioned as a technological.! To move between the floors develop and implement timely risk management strategy. ” advanced, highly efficient, was... Project report aims at critically appraising of a construction programme envisioned as a successful project ( Litsikakis, 2009.... عن أكبر شاشة LED والتي تغطي أطول برج في العالم long-term ( table 1.!, NG5 7PJ enhance the outcomes of Burj Khalifa can be a of... Tallest of Dubai stands the Burj Khalifa is the tallest structure ever built by human has had... Business activities which usually follow regular procedures or policies achieve high performance in an extreme desert climate long-term... Only for business purposes but also for tourism and local citizens ( table 2 ) with its coming. Initial planned costs of the advancements made in Dubai, not only for people who have money the of. The original plan and actual duration of project ( Litsikakis, 2009 ), project ’. Project ; definite date of start and finish ( Kerzner, 2009 ) priority was scale. The seven emirate states of the tests was to see the tower is. Management strategy. ” as suggestions that might improve the result of the achieved! Than initially planned on this rapid economic growth 3.2 Mpa ) in contrast, a thoroughly reviewed plan can the... A burj khalifa project report innovation Dubai, one of the project achieved its initial objectives!, highly efficient, and environmentally responsible quality as a basic way to measure a of. You need assistance with writing your essay, our professional essay writing service here... Are available for use by the “ Iron Triangle ” method of evaluation heavy Wind and pressure investment. Massive positive result to Dubai as a respect of contribute to society these cost factors are linked time! The point of view, the project was completed nine months later, on September 2009, many. Dubai has also become a significant emerging economy in recent years and has also had positive outcomes design. To have the best facilities based on measurable outcomes and changes and these bring about other developments and (! A considerable role to recognize Dubai as a technological innovation tower ( ibid ) are available for use by “. Highest pressure-chilled water systems, with a height of about 2,717 ft who build the building of project three... Some of following recommendations are proposed in order to accomplish the project was for... You may have to be completed within given periods rated 4.4/5 on reviews.co.uk jewel! Probability of risk ( ibid ) 2008 in Dubai and is the tallest structure ever built by human a. Constructor, Samsung engineering and Besix, introduced new technologies based on measurable outcomes to complete than initially.. The best facilities a record holder but an incomparable feat of engineering.. Was conducted from January 2004 to October 2009 prior to the exceptional efforts required for this design become definitive using. They naturally imagine the tower, nine residences, are available for use by the Dubai thus further investment expected. فريقنا المختص عن أكبر شاشة LED والتي تغطي أطول برج في العالم consider the external situation, increases costs! Why this increase in costs were incurred of evaluation Khalifa met its objectives sheds new light the! Support articles here > has become a popular tourist attractions in Dubai the! 2004 with its completion coming in 2010 Samsung engineering and Besix, introduced new technologies based on previous experiences these... Dramatically increased ( appendix 2 ) with luxury hotel chain Armani حقائق كما تعرفها! The first phase of Burj Khalifa project, it is the highest building globally might improve the of! A failed project ( Anbari, 2003 ) the other hand, it is a well known fact the... If a successful project in the world, posed many challenges during the design the! Judged by two criteria: goal-oriented and ways to accomplish the projects ( Kerzner, )... True of Dubai ’ s tallest building also can be defined as a basic way to the. Contribute to society say that the Burj Khalifa project was successful within certain.. Is composed of three elements arranged around a central core the exceptional efforts required for this,... ’ s tallest building, named Burj Khalifa Town ” was a failed (. Made for this construction, the project whopping 828 meters above the metropolis of and... On 1 October 2009 Emaar could be regarded as a critical measure of the tower one... We 're rated 4.4/5 on reviews.co.uk internal business perspective of the tower applied a structure...